Superseded planning policies
The new borough-wide local plan 2033, known as LP33, is the key strategic planning document used to direct and guide development in the borough up to 2033. LP33 combines and replaces the following – the core strategy, development management local plan and site allocations local plan as well as the area action plans for Dalston, Hackney Central and Manor House.
Dalston area action plan
The Dalston area action plan (AAP) is a comprehensive strategy for co-ordinated development and design that reflects local aspirations for the future of the area. It is a guide to balanced development and provides confidence and certainty to developers and other public sector bodies.
The purpose is to establish the basis for shaping the regeneration of the area and to ensure the continued role of Dalston as a major town centre whilst respecting its unique character. The AAP has a strong focus on implementation and forms a statutory component of the local development framework.
The final version of the AAP incorporating the changes arising from the inspector’s final report were approved for adoption by cabinet and Council on 17 December 2012 and 30 January 2013 respectively.
The Council would like to thank everyone who engaged in the various rounds of public consultation and the examination in public.
A new Dalston supplementary planning document (SPD) will support the delivery of the growth strategy for Dalston set out in the forthcoming Local Plan 2033 (LP33). Find out more about the new Dalston SPD, or the recent Dalston Quarter development principles consultation.
The background supporting material such as the masterplan baseline report is included below:
- Dalston baseline report part 1
- Dalston masterplan scoping report part 2
- Dalston masterplan scoping report part 3
- Dalston masterplan scoping report part 4
- Dalston masterplan scoping report part 5
- Dalston masterplan scoping report part 6
- Dalston masterplan scoping report part 7
- Dalston masterplan scoping report part 8
- Dalston masterplan scoping report part 9
- Dalston phase 1 AAP – options study – March 2008 p1-15
- Dalston phase 1 AAP – options study – March 2008 p16-31
- Dalston phase 1 AAP – options study – March 2008 p32-49
- Supporting information, including:
- Draft interim Dalston area action plan (phase 1) – masterplan – development plan document for public participation
- Dalston sustainability appraisal report – March 2009
- Dalston equalities impact assessment – pre consultation version – March 2009
- Dalston energy study
- Dalston phase 1 AAP – consultation report 2009
- Dalston area action plan (phase 1) – consultation database
- Dalston area action plan (phase 1) – masterplan (November 2009)
- supporting documents to Dalston area action plan (phase 1) – masterplan (November 2009) equalities impact assessment
- London Borough of Hackney – Dalston area action plan – issues and options 2005
- London Borough of Hackney – Dalston area action plan – preferred options (October 2005)
- Supporting information 2, including:
- supporting documents to Dalston area action plan (phase 1) – masterplan (November 2009) sustainability appraisal
- supporting documents to Dalston area action plan (phase 1) – masterplan (November 2009) habitats regulations assessment
Major studies/policies/strategies
- LBH – Hackney Night Time Economy Evidence Base Study – February 2005
- LBH – Hackney Retail and Leisure Study – May 2005
- LBH – Hackney Retail Centres Study 2011
- LBH – Town Centre Health Check 2010
- LBH – Hackney Tall Buildings Strategy – February 2005
- LBH – Urban (Housing) Capacity Study (Entec) – August 2005
- LBH – Hackney Employment Growth Options Study – March 2006
- LBH – Hackney Open Space and Sports Assessment
- LBH – Hackney Open Space and Sports Assessment Volume 1&2 June 2004
- LBH – Hackney Open Space and Sports Assessment Volume 1&2 Figures
- LBH – A Strategy for Parks in Hackney (2008)
- LBH – Local Implementation Plan (under transport) – 2006 – 2011
- LBH – Local Implementation Plan 2 (2011/12 – 2013/14)
- LBH – Core Strategy – Proposed Submission Document (2009)
- LBH – Core Strategy Adopted (2010)
- GLA – Mixed Use Development and Affordable Housing Study – March 2004
- GLA – Housing for a Compact City – February 2003
- GLA – London Renewables – Integrating renewable energy into new developments: toolkit for planners, developers and consultants
- LBH – Cultural Strategy Framework
- LBH – Inventory of parking off street/on street restrictions and CPZ aerial boundaries
- LBH – State of the Historic Environment Report – 2005
- Study of Small Business Workspace Provision in Hackney – 2006
- Hackney’s State of the Environment Report – 2008
- Hackney Play Strategy 2007 – 2012
- Hackney’s Sustainable Community Strategy 2008 – 2018
- LBH – Hackney Unitary Development Plan – June 1995
- LBH – List of Statutorily Listed Buildings
- LBH – List of Locally Listed Buildings
- LB Hackney/English Heritage – Supplementary Planning Guidance: Shopfront Design
- LBH Housing Strategy 2010 – 2015
Supplementary planning guidance
Planning policy statements
Hackney Central area action plan
The Hackney Central area action plan is a comprehensive strategy for co-ordinated development and design that reflects local aspirations for the future of the area.
It is a guide to balanced development and provides confidence and certainty to developers and other public sector bodies.
The overall purpose is to establish the basis for shaping the regeneration of the area and to ensure the continued role of Hackney Central as a district town centre whilst respecting its unique character. The AAP has a strong focus on implementation and forms a statutory component of the local development framework.
The final version of the area action plan incorporating the changes arising from the inspector’s final report were approved by cabinet and Council on 22 and 24 November 2012 respectively for adoption.
The Council would like to thank everyone who engaged in the various rounds of public consultation and the examination in public.
A comprehensive list of all background supporting material (such as the AAP baseline report) is included below.
- Hackney Central AAP Scoping Report Part 1
- Hackney Central AAP Scoping Report Part 2
- Hackney Central AAP Scoping Report Part 3
- Hackney Central AAP Scoping Report Part 4
- Hackney Central AAP Scoping Report Part 5
- Hackney Central AAP Scoping Report Part 6
- Hackney Central AAP Scoping Report Part 7
- Hackney Central AAP Scoping Report Part 8
- Hackney Central AAP Scoping Report Part 9
- Hackney Central AAP Scoping Report Part 10
- Hackney Central AAP – Representations Received
- Hackney Central Area Action Plan (Phase 1) – Masterplan, March 2009
- Hackney Central Sustainability Appraisal Report – March 2009
- Hackney Central Equalities Impact Assessment – Pre Consultation Version – March 2009
- Hackney Central Area Action Plan (Phase 1) – Masterplan, November 2009
- Hackney Central Phase 1 AAP – Summary Consultation Report (November 2009)
- Hackney Central Area Action Plan (Phase 1) Masterplan Consultation Database – November 2009
- Clapton Square Conservation Area Appraisal
- Town Hall Square and Mare Street Conservation Area Appraisal
- Hackney Central Area Action Plan Issues and Options Manual – 2005
- Hackney Central Land Use and Design Baseline Report – 2005
- Hackney Central Transport Baseline Study – 2005
Major studies/policies/strategies
- LBH – Hackney Night Time Economy Evidence Base Study – February 2005
- LBH – Hackney Retail and Leisure Study – May 2005
- LBH – Hackney Retail Centres Study 2011
- LBH – Town Centre Health Check 2010
- LBH – Hackney Tall Buildings Strategy – February 2005
- LBH – Urban (Housing) Capacity Study (Entec) – August 2005
- LBH – Hackney Employment Growth Options Study – March 2006
- LBH – Hackney Open Space and Sports Assessment
- LBH – Hackney Open Space and Sports Assessment Volume 1&2 June 2004
- LBH – Hackney Open Space and Sports Assessment Volume 1&2 Figures
- LBH – A Strategy for Parks in Hackney (2008)
- LBH – Local Implementation Plan (under transport) – 2006 – 2011
- LBH – Local Implementation Plan 2 (2011/12 – 2013/14)
- LBH – Core Strategy – Proposed Submission Document (2009)
- LBH – Core Strategy Adopted (2010)
- GLA – Mixed Use Development and Affordable Housing Study – March 2004
- GLA – Housing for a Compact City – February 2003
- GLA – London Renewables – Integrating renewable energy into new developments: toolkit for planners, developers and consultants
- LBH – Cultural Strategy Framework
- LBH – Inventory of parking off street/on street restrictions and CPZ aerial boundaries
- LBH – State of the Historic Environment Report – 2005
- Study of Small Business Workspace Provision in Hackney – 2006
- Hackney’s State of the Environment Report – 2008
- Hackney Play Strategy 2007 – 2012
- Hackney’s Sustainable Community Strategy 2008 – 2018
- LBH – Hackney Unitary Development Plan – June 1995
- LBH – List of Statutorily Listed Buildings
- LBH – List of Locally Listed Buildings
- LB Hackney/English Heritage – Supplementary Planning Guidance: Shopfront Design
- LBH Housing Strategy 2010 – 2015
Supplementary planning guidance:
Planning policy statements
Hackney Wick area action plan
The Hackney Wick area action plan plays a central role in the regeneration of Hackney Wick. It provides a coherent strategy for guiding development and investment, and seeks to influence the direction of and maximise the benefits from the 2012 Olympic and Paralympics Games and their legacy for the wider Wick neighbourhood, half of which sits within the Olympic Park itself.
If you have any questions or would like copies of any of the documents please phone 020 8356 7743 or email ldf@hackney.gov.uk.
The final version of the Hackney Wick area action plan was approved by Cabinet on 10 September and Council on 19 September for formal adoption under Section 23 (Adoption of local development documents) of the Planning and Compulsory Purchase Act 2004.
We would like to thank everyone who engaged in the various rounds of public consultation and in the examination in public.
The majority of supporting documents and evidence used to inform the AAP can be found on the LDF evidence page.
The remaining background supporting material such as the baseline reports (April 2008 and October 2008) are included below.
Major studies/policies/strategies
- LBH – Urban (housing) capacity study (Entec) – August 2005
- LBH – Hackney employment growth options study – March 2006
- LBH – Hackney open space and sports assessment
- LBH – Hackney open space and sports assessment volume 1 and 2 figures
- LBH – Hackney unitary development plan – June 1995
- Mayor of London – London plan
The London Legacy Development Corporation (public sector organisation established by the Mayor or London) is the local planning authority for an area in East London which includes Hackney Wick.
Core strategy
The core strategy is the primary and strategic document in the local development framework (LDF). It sets out a long term spatial vision and strategic objectives for future development in the area. It is characterised as the spatial expression of Hackney’s sustainable community strategy and is shown diagrammatically in the proposals map.
The final versions of the core strategy and proposals map incorporating the changes arising from the inspector’s binding report:
- Hackney core strategy development plan document (December 2010)
- proposals map (November 2010)
- proposals map schedule (November 2010)
- sustainability appraisal statement (November 2010)
- core strategy development plan document adoption statement
Compliance checklists of the core strategy policies and the saved UDP policies against the national planning policy framework (NPPF):
- compliance checklist of the LDF policies against the NPPF
- Planning Advisory Service compliance checklist of the LDF core strategy appendix 1
- Planning Advisory Service compliance checklist of the saved UDP policies appendix 2
We do not have any printed copies of the core strategy, proposals map or schedule available for sale.
For more information, email ldf@hackney.gov.uk, or call 020 8356 8084.
We’ve produced and commissioned a series of studies, documents and background evidence which provide information to support the production of the Hackney local development framework (LDF).
- background to development of the core strategy v6, 2010
- Bishopsgate Goods Yard Interim planning guidance 2010
- core strategy issues and options evidence appendix
- Dalston area action plan 2013
- development management consultation report July 2013
- development management local plan – draft for public participation July 2012
- development management local plan – equalities impact assessment publication July 2013
- development management local plan – equality impact assessment – draft for public participation (July 2012)
- development management local plan – habitat regulations assessment – draft for public participation (July 2012)
- Development management local plan – sustainability appraisal – draft for public participation (July 2012)
- development management local plan – sustainability appraisal publication July 2013
- equalities impact assessment, 2009
- Hackney regeneration delivery framework 2009
- Hackney borough profile, 2006
- Hackney Central area action plan 2012
- Hackney core strategy (adopted 2010)
- Hackney core strategy, a strategic alignment report, 2009
- Hackney infrastructure assessment and delivery plan 2011-14
- Hackney planning contributions supplementary planning document, 2006
- Hackney unitary development plan 1995
- Hackney Wick area action plan 2012
- Holman and N. Holman Torah, worship and acts of loving kindness: baseline indicators for the Charedi community in Stamford Hill, 2002
- annual monitoring report 2008/09
- authority monitoring report 2011-12
- letter from GLA regarding conformity, 2013
- Local development scheme 2010-13
- Local development scheme 2013
- local plans and the national planning policy framework – compatibility self assessment checklist – LBH saved policies
- London plan 2011
- Manor House area action plan 2013
- notes on the protection and provision of traveller sites in London Borough of Hackney
- open for business – development prospectus 2010
- proposed development management local plan – policies map (July 2012)
- public realm SPD, 2012
- representations database with officers response (July 2013)
- residential extensions and alterations SPD, 2009
- revised early minor alterations to the London plan (October 2013)
- SALP equality impact assessment – draft for public participation July 2012
- SALP equality impact assessment – publication July 2013
- schedule of changes to the site allocation local plan at publication stage June 2013
- site allocations local plan – consultation report July 2013
- site allocations local plan – habitats regulation assessment draft for public participation July 2012
- site allocations local plan – sustainability appraisal draft for public participation July 2012
- site allocations local plan – sustainability appraisal July 2013
- site allocations local plan – draft for public participation July 2012
- South Shoreditch SPD, 2006
- statement of Licensing 2011
- sustainable community strategy 2008-2018 (2009)
- Woodberry Down regeneration: A framework for regeneration, 2009
- Hackney tall building strategy – phase 1 – baseline studies
- Hackney tall building strategy – phase 2 – urban analysis and conclusion
- Hackney tall building strategy – phase 3 – detailed area studies
- Hackney tall building strategy – phase 4 – tall buildings design guidance and application checklist
- London view management framework, 2012
- The state of Hackney’s historic environment, 2005
Please note: Although the material has been commissioned by Hackney, for Hackney and is on our website, these reports are the work of independent consultants and any recommendations contained in the reports should not be taken as approved Hackney policy.
- Hackney employment growth options study update, 2010
- Hackney employment growth options study final report , 2006 part 1
- review of live-work policy in Hackney, London residential research, 2005
- study of small business workspace provision in Hackney, 2006
Employment growth options study
Please note: Although the material has been commissioned by the Council, for Hackney and is on our website, these reports are the work of independent consultants and any recommendations contained in the reports should not be taken as approved Hackney policy.
Executive summary
Presentation boards are a summary of the work completed to date.
- employment growth options study executive summary report
- employment growth options study executive summary map
Full report
- employment growth options study main report – part 1
- employment growth options study main report – part 2
Appendices
- air quality action plan 2006
- air quality action plan update 2010
- Bio-diversity action plan 2012-2017
- cleaning the air: the Mayor’s air quality strategy 2010
- contaminated land strategy
- heat mapping report
- Hackney state of the environment report , 2008
- Hackney climate change strategy, 2009
- strategic flood risk assessment level 2
- strategic flood risk assessment level 2:: appendix B data register
- strategic flood risk assessment level 2: appendix C GIS layers
- strategic flood risk assessment level 2: appendix D figures 4A-4C
- strategic flood risk assessment level 2: appendix D figures 5A-5C
- strategic flood risk assessment level 2: appendix D figures 6A-6C
- strategic flood risk assessment level 2: appendix D figures 7-9
- Hackney strategic food risk assessment sequential test, 2009
- strategic flood risk assessment level 1, August 2008
- the North London waste plan preferred options report, 2009
- surface water management plan 2010
- Entec housing capacity study executive summary, 2005
- Hackney housing needs assessment 2009, (incl housing needs survey 2009)
- Hackney housing strategy 2010-2015 (consultation document), 2010
- Hackney affordable housing viability study, 2010
- Affordable housing viability study, 2011 update
- GLA housing SPG
- Housing needs update, 2011
Housing capacity study
Please note: Although the material has been commissioned by the Council, for Hackney and is on our website, these reports are the work of independent consultants and any recommendations contained in the reports should not be taken as approved Hackney policy.
Evidence day housing capacity study presentation boards
Executive summary
Full report (excluding appendices)
Appendices
- GLA access to nature
- Habitat regulations assessment, 2009 (updated 2010)
- open space and sports assessment volumes 1 and 2
- Lea Valley Regional Park plan and development framework (Lea Valley Regional Park)
Open space study
Please note: Although the material has been commissioned by the Council, for Hackney and is on our website, these reports are the work of independent consultants and any recommendations contained in the reports should not be taken as approved Hackney policy.
Open space and sports assessment
Report (excluding figures and appendices)
Appendices
Figures
Please note: Although the material has been commissioned by Hackney, for Hackney and is on our website, these reports are the work of independent consultants and any recommendations contained in the reports should not be taken as approved Hackney policy.
Please note: Although the material has been commissioned by Hackney, for Hackney and is on our website, these reports are the work of independent consultants and any recommendations contained in the reports should not be taken as approved Hackney policy.
- Hackney retail centre study, 2011
- retail health check, 2010
- Hackney retail and leisure study, 2005
- Hackney night time economy Feb, 2005
- Shoreditch night-time economy study, 2007
Retail and leisure study
Please note: Although the material has been commissioned by the Council, for Hackney and is on our website, these reports are the work of independent consultants and any recommendations contained in the reports should not be taken as approved Hackney policy.
Evidence day retail and leisure study presentation boards
Presentation boards are a summary of the work completed up to May 2005.
Small business workspace provision
Please note: Although the material has been commissioned by Hackney, for Hackney and is on our website, these reports are the work of independent consultants and any recommendations contained in the reports should not be taken as approved Hackney policy.
- DfT manual for streets 1 and 2
- DfT Inclusive mobility guidance
- Hackney health and wellbeing profile
- Hackney transport strategy – sections 1-13
- local plans and the national planning policy framework – compatibility self assessment checklist, LBH core strategy
- local plans and the national planning policy framework – compatibility self assessment checklist – LBH saved UDP policies
- Hackney local implementation plan 2
- Mayor’s best practice guidance – health issues in planning (2007) (no longer available)
- TfL transport assessment best practice – guidance documents (2010) (no longer available)
- TfL making freight work for you (no longer available)
- TfL travel planning for new development in London 2011 (no longer available)
- parking and enforcement plan 2013
Development management local plan
The development management local plan (DMLP) sets out detailed, generally criteria-based, planning policies which we will use, together with the London plan, the core strategy and other supplementary planning documents, to assess planning applications.
The Council formally adopted the development management local plan (DMLP), including the policies map, on 22 July 2015.
- adopted Hackney DMLP (July 2015)
- DMLP sustainability appraisal
- sustainability appraisal on post submission modifications
- policies map (July 2015)
- adoption statement of the DMLP
- planning inspector’s final report
Previous stages
An independent planning inspector, Simon Berkeley BA MA MRTPI, held hearings 24-25 September 2014 to determine whether it is sound.
The inspector’s schedule of main modifications does not include the main modification (ref. MM40). Following a high court decision, the inspector no longer considered the proposed amendment necessary to make the DMLP sound. The high court decision was made as part of the case West Berkshire District Council, Reading Borough Council and Department for Communities and Local Government (case ref CO/76/2015).
We provided further information to the inspector in response to matters raised during the hearings. We consulted on proposed main modifications to the DMLP (post examination in public) and the sustainability appraisal on post submission modifications:
- DMLP main modifications (post examination in public)
- sustainability appraisal (post submission modifications)
The consultation took place February to April 2015.
The proposed plan was amended, taking consultation responses into account and after an internal review following the regulation 18 public participation.
The draft plan underwent the first stage of public consultation (Regulation 18) in July-September 2012. See this version of the document and its supporting documents:
There were around 400 representations from 68 different representors to the consultation document in July-September 2012. Following the consultation period, we reviewed representations and met with internal and external people and organisations, including those who made representations. Where appropriate we amended the plan, and produced an updated version for this stage.
More information
For more information about the local plan, contact us on ldf@hackney.gov.uk or 020 8356 8084.
Key submission documents
1. Development management local plan
2. Development management local plan – schedule of changes (December 2013)
3. Development management local plan – policies map (December 2013)
4. Development management local plan – sustainability appraisal report (December 2013)
5. Development management local plan – habitats regulation assessment (July 2013, No Change)
6. Development management local plan – equality impact assessment (December 2013)
7. Development management local plan consultation report (December 2013)
8. Schedule of respondents and representations (December 2013)
9. Copies of representations (received during publication July – September 2013)
12. LBH development management local plan – equalities impact assessment, publication (July 2013)
13. LBH development management local plan – sustainability appraisal, publications (July 2013)
14. LBH development management local plan – consultation report (July 2013)
15. LBH representations database with officer responses (July 2013)
16. LBH development management local plan – draft for public participation (July 2012)
17. Proposed development management local plan – policies map (July 2012)
18. LBH development management local plan – sustainability appraisal – draft for public participation (July 2012)
19. LBH development management local plan – habitat regulations assessment – draft for public participation (July 2012)
20. development management local plan – equality impact assessment – draft for public participation (July 2012)
21. LBH sustainable community strategy 2008-2018, (2009)
22. Local development scheme 2013
23. Latest authority monitoring report 2011-12
23a. Authority monitoring report 2012-13
24. Letter from GLA regarding conformity, 2013
25. LBH unitary development plan, 1995 (see also 82 and 83)
26. LBH UDP saved proposals map
27. Hackney core strategy (adopted 2010)
For the town centre and retail documents, please visit core strategy evidence base.
39. Hackney retail and leisure study, 2005
- executive summary
- visitor survey
- household survey
- health check
40. Hackney retail centre study, 2011
41. Retail health check, 2010
42. Hackney night-time economy evidence base, 2005
43. Shoreditch night-time economy study, 2007
44. Hackney employment growth options study update, 2010
45. Hackney employment growth options study final report , 2006 part 1
-
-
- part 2
- appendices
-
46. Study of small business workspace provision in Hackney, 2006
47. Entec housing capacity study executive summary, 2005
48. Hackney housing needs assessment 2009, (inc housing needs survey 2009)
49. Housing needs update, 201
50. Hackney housing strategy 2010-2015 (consultation document), 2010
51. Hackney affordable housing viability study, 2010
- appendix 1: 30% affordable
- appendix 1: 40% affordable
- appendix 1: 50% affordable
- affordable housing viability study, 2011 update
52. GLA housing SPG
53. East London Partnership – executive summary stages 1 and 2
- East London Partnership – executive summary
- East London Partnership – stage 1
- East London Partnership – stage 2
54. Hackney tall building strategy, 2005
- Hackney tall building strategy – phase 1 – baseline studies
- Hackney tall building strategy – phase 2 – urban analysis and conclusion
- Hackney tall building strategy – phase 3 – detailed area studies
- Hackney tall building strategy – phase 4 – tall buildings design guidance and application checklist
55. The state of Hackney’s historic environment, 2005
56. London view management framework, 2012
57 and 58. Open space and sports assessment volumes 1 and 2
59. Lea Valley Regional Parks plan and parks development framework (Lea Valley Regional Park)
60. GLA access to nature
For the environment documents, please visit core strategy evidence base.
61. Heat mapping report
62. Hackney climate change strategy, 2009
63. Strategic flood risk assessment level 2
64. Hackney strategic flood risk assessment sequential test, 2009
65. Strategic flood risk assessment level 1, August 2008
66. Surface water management plan 2010
67. Bio-diversity action plan 2012-2017
68. Air quality action plan
69. Air quality action plan update
70. Cleaning the-air: the Mayor’s air quality strategy 2010
71. Contaminated land strategy
72. Hackney transport strategy (sections 1 – 13)
73. Local implementation plan 2
74. Parking and enforcement plan 2013
75. DfT manual for streets 1 and 2
76. DfT inclusive mobility guidance
77. TfL transport assessment best practice – guidance documents (2010)
78. TfL making freight work for you
79. TfL travel planning for new development in London 2011
80. Hackney health profile (2010)
81. Mayor’s best practice guidance – health issues in planning (2007)
82. Local plans and the national planning policy framework – compatibility self assessment checklist, LBH core strategy
83. Local plans and the national planning policy framework – compatibility self assessment checklist – LBH saved policies
84. Further alterations to the London plan 2014
85. National planning policy framework 2012
86. Planning policy for traveller sites 2012
87. DMLP – cabinet report – draft for public participation 2012
88. Appendix 2 – draft consultation plan for draft DMLP and SALP 2012
89. Hackney local plan viability assessment 2014
Additional evidence (90-98)
90. Hackney CIL viability report Dec 2013
91. Hackney CIL viability report Nov 2012
92. Hackney CIL viability report 2014
93. LBH exemption bid
94. Town centre health check data
95. Letter from Natural England in relation to HRA
96. Proposed modifications to DMLP – track change version
97. DM12 hot food takeaway justification
98. Legal advice on policy DM8
Additional evidence 99-106
99. Legal advice and further justification for policy DM46
100. Legal advice and further justification for policy DM48
101. Additional evidence for public house protection policy DM5
102. Hackney pubs evidence base study
103. Keeping local – evidence base study for public houses
104. Overview of engagement since EIP hearing
105. Evidence and summary of consultation
- appendix 1 – Hackney Today issue 285, pages 22 and 23
- appendix 2
- appendix 3
- appendix 4
- appendix 5
- appendix 6
- appendix 7
- appendix 8
- appendix 9
- appendix 10
- appendix 11
- appendix 12
- appendix 13
- appendix 14
- appendix 15
- appendix 16
106. City and Hackney health and wellbeing profile – data update 2014
10. LBH statement of community involvement (2014)
11. LBH duty to co-operate report (December 2013)
Planning duty desk
Telephone
Opening times
- Monday, Tuesday, Thursday, Friday – 9am to 5pm (telephone)
- Wednesday – 9am to 4pm (telephone)